Li-polymer batteries

Compliance & traceability guidance

Key controls

What must be kept together

Li-polymer pouch packs need the same evidence discipline as other rechargeable lithium-ion batteries, with particular attention to pouch format, mechanical protection and the actual cell-to-pack configuration.

  • Verify pouch dimensions, tab layout and approved assembly drawing.
  • Confirm the real series/parallel arrangement and the number of bound cells.
  • Preserve model-specific safety, transport and material evidence.
01

Mechanical configuration

Document cell dimensions, swelling clearance, insulation, lead polarity and connector pinout. A drawing or label change must be checked against the physical product.

02

Cell pairing and assembly

For a 1S2P pack, record both parallel cells and their positions. Pairing rules for measured voltage, capacity and resistance should come from an approved engineering standard rather than a generic threshold.

03

Safety and substance records

Use the applicable SDS, supplier declarations and test reports for the actual pouch-cell revision. Show concentrations or “not detected” claims only with a traceable basis.

04

Public information

Publish approved rated energy, charging limits, safety warnings and separate-collection guidance. The LP103450H-1S2P demo record illustrates the intended pack-level layout.

Evidence to review before release

Approved model specification, BOM and supplier material declarations; applicable safety and transport documents; label artwork; manufacturing and quality records; current document revisions. Applicability depends on the exact product and destination market.

Primary regulatory reference: Regulation (EU) 2023/1542. This page explains a workflow and does not certify a particular product.

Need a model-specific record?

See the LP103450H-1S2P sample or contact our team about documentation for your battery configuration.

View sample record →Email VTC POWER